RSS Feed for REMSI List of ChangesClick here for RSS feed of REMSI List of ChangesClick here to learn more about what an RSS feed is.Print this list

Customer Reference Specifications-List of Changes: 2012, 2011,
2010
Complete List of Changes for Sketches:
2011, 2010

REMSI Rules - List of Changes: 2011, 2010
Definitions - List of Changes: 2011

Approved Metering and Equipment Tables-List of Changes:
2012, 2011, 2010

SKETCH NOTES

NOTE

"PPL" and "Company" will be changed to "PPL EU", "PPL's" and "Company's" will be changed to "PPL EU's".

NOTE 1

All updated sketches have been redrawn for clarity using a new format.

NOTE 2

The 3 phase, 4 wire, 240-single phase 120/240 volts service is now referred to as 3 Phase, 4 Wire, Delta 240/120 Volts.

NOTE 3

Are changing the terms ' meter trough' to 'meter base' and 'meter mounting' to 'meter panel'.

 

Sketch # 2011 Changes, Updates and Additions
3B

03/18/11 Updated Format and Content

7 03/18/11 Updated Format and Content
7B 03/18/11 New Sketch
8C 08/12/11 Updated Format & Content
8D 08/12/11 New Sketch

Sketch 16 Series - Sketch 16A has been revised, reformatted and updated into a series of sketches:

  • Sketch 16 - up to and including 2000A - 8 conduits
  • Sketch 16A - up to and including 3000A - 12 conduits
  • Sketch 16B - up to and including 4000A - 16 conduits
20 08/12/11 New Sketch
49 08/12/11 Updated Title & Format
54A 08/12/11 Updated Title & Format
55 08/12/11 Updated Format & Content
Distributed Generation Sketch Series have been updated, expanded and renumbered for organization. Each sheet has had content updated or in new. The new Distributed Generation Series is as follows:
Distributed Generation Organization Map
Metering Type Voltage Load Center Bus Bar Rating Sketch #
Self-Contained Less than 480 V Up to and Including 20% 56
Over 20% 56A
480V Self-Contained 480 V Up to and Including 20% 57
Over 20% 57A
CT/Secondary Less than 600 V Up to and Including 20% 58
Over 20% 58A
12 kV 12 kV Pole Mount Up to and Including 20% 59
Over 20% 59A
Switchgear All Options 59B

return to top

Sketch # 2010 Changes, Updates and Additions
19

04/07/10 New Sketch

25C 04/30/10 Corrected Format, updated drawings, revised title for clarity, added Detail Box
25D 04/30/10 Corrected Format, updated drawings, revised title for clarity, added Detail Box
41 Series 09/17/10 Transfer Switches have been updated and reorganized.
41P1

41P2

41AP1

41AP2
09/17/10 the notes section has been expanded, the drawing updated accordingly and the detail box added.
41BP1

41BP2

41CP1

41CP2

41DP1

41EP1

09/17/10 renumbered to mimic organization of previous 41 Series Sketches. Notes have been expanded, the drawing updated accordingly and the detail box added.

Old Numbering:
Sketch 41P1 – Manual Transfer Switch – Partial Load – Less than 600V
Sketch 41P2 – Manual Transfer Switch – Full Load – Less than 600V
Sketch 41AP1 – Automatic Transfer Switch – Partial Load – Less than 600V
Sketch 41AP2 – Automatic Transfer Switch – Full Load – Less than 600V
Sketch 41BP1 – Manual or Automatic Transfer Switch - Partial Load – 12KV Load Center
Sketch 41BP2 – Automatic Transfer Switch – Full Load – 12KV Load Center
Sketch 41BP3 – Manual or Automatic Transfer Switch – 12KV Switchgear
Sketch 41CP1 – Manual or Automatic Transfer Switch – 12KV Switchgear

New Numbering:
Sketch 41P1 – Manual Transfer Switch – Partial Load – Less than 600V
Sketch 41P2 – Manual Transfer Switch – Full Load – Less than 600V
Sketch 41AP1 – Automatic Transfer Switch – Partial Load – Less than 600V
Sketch 41AP2 – Automatic Transfer Switch – Full Load – Less than 600V
Sketch 41BP1 – Manual Transfer Switch – Partial Load – 12KV Load Center
Sketch 41BP2 – Manual Transfer Switch – Full Load – 12KV Load Center
Sketch 41CP1 – Automatic Transfer Switch – Partial Load – 12KV Load Center
Sketch 41CP2 – Automatic Transfer Switch – Full Load – 12KV Load Center
Sketch 41DP1 – Manual Transfer Switch – 12KV Switchgear
Sketch 41EP1 – Automatic Transfer Switch – 12KV Switchgear

56P1

56P2
10/22/10 Corrected Rule Reference 26 to Rule Reference 28

09/17/10 New Sketches

Sketch 56P1 – Distributed Generation Sketch - Under 20% Load Center Bus Bar Rating – Less than 600V
Sketch 56P2 – Distributed Generation Sketch - Over 20% Load Center Bus Bar Rating – Less than 600V
56AP1

56AP2

56BP1
10/22/10 Corrected Rule Reference 26 to Rule Reference 28

10/15/10 New Sketches

Sketch 56AP1 – Distributed Generation Sketch - Under 20% Load Center Bus Bar Rating – 12KV
Sketch 56AP2 – Distributed Generation Sketch - Over 20% Load Center Bus Bar Rating – 12KV
Sketch 56BP1 – Distributed Generation Sketch - Under 20% Load Center Bus Bar Rating

return to top

 

List of Changes - Customer Reference Specifications
2012 Changes to CRS's are:

6-10-165 Outdoor Lighting - Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE

  • 10/31/11 Sheet 1-16
    • Updated wordings of general notes and updated numbers in Sheets 2 and 3.
    • Updated last paragraph in Sheet 4.
    • Updated sheet numbers in Sheet 5.
    • Updated figure and sheet number in Sheet 6.
    • Updated last paragraph and figures number on Sheet 7.
    • Updated sheet numbers in Sheet 8.
    • Updated figure and sheet number in Sheet 9.
    • Updated diagram label in Sheet 10.
    • Updated diagram label in Sheet 11.
    • Updated diagram clearance in Sheet 12.
    • Updated figure number and updated diagram in Sheet 13.
    • Updated diagram label and dimensions. Updated format in Sheet 15.
    • Updated figures, number and fonts.

return to top

 

List of Changes - Customer Reference Specifications
2011 Changes to CRS's are:

6-09-194 Overhead Service to Overhead

  • 09/08/11 Sheet 1
    • Made into formal title page, content now starts on Sheet 2.
    • Added statement, specifying CRS 6-09-194 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 09/08/11 Sheet 2
    • Split Note 1 into Note 1 and 2.
    • Re-numbered notes accordingly.
    • Updated new Note 4 - ground wire comes from the lightning arrestor cross arm.
  • 09/08/11 Sheet 3
    • Updated Bill of Material to meet current requirements.
  • 09/08/11 Sheet 4
    • Updated Bill of Material to meet current requirements.
  • 09/08/11 Sheet 5
    • Updated drawing notes to match Bill of Material changes.
  • 09/08/11 Sheet 6
    • Updated drawing notes to match Bill of Material changes.
  • 09/08/11 Sheet 7
    • Metering Compartment Drawing - added references to Note 18 and Note 19.
    • Removed Detail B. Terminal block is to be attached to neutral bar; previously terminal block was attached to the side of the termination compartment.
    • Updated minimum working clear space in front of metering compartment to 9' 0" from 5' 0".

6-09-199 Installation Instructions For 3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments in Customer-Owned Switchgear

  • 09/08/11 Sheet 5
    • Bill of Material item 3 updated.
  • 09/08/11 Sheet 7
    • Updated drawing - VT's to be mounted on shelf instead of on back of metering compartment.

6-14-121 Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Only Electric Lines (Non-Joint Trench)

  • 09/08/11 Sheet 1
    • Updated title.
    • Made into formal title page, content now starts on Sheet 2.
    • Added statement, specifying CRS 6-14-121 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 09/08/11 Sheet 2
    • Added reference to CRS 6-15-180.
    • Updated information in Note 2.
  • 09/08/11 Sheet 4
    • Added flow-able fill as a select backfill option
  • 09/08/11 Sheet 5
    • Notes expanded to Sheet 5, all pages from this point forward were renumbered accordingly.
  • 09/08/11 Sheet 6
    • Updated drawing notes and added more detail on dimensions.
  • 09/08/11 Sheet 7
    • Updated drawing for content and clarity.

6-14-122 Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Electric and/or Gas, Telecommunication Lines (Joint Trench)

  • 09/08/11 Sheet 1
    • Updated title.
    • Made into formal title page, content now starts on Sheet 2.
    • Added statement, specifying CRS 6-14-122 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 09/08/11 Sheet 2
    • Added reference to CRS 6-15-180.
    • Updated information in Note 2.
  • 09/08/11 Sheet 4
    • Added flow-able fill s a select backfill option.
  • 09/08/11 Sheet 5
    • Notes expanded to Sheet 5, all pages from this point forward were renumbered accordingly.
  • 09/08/11 Sheet 6
    • Updated drawing notes and added more detail on dimensions.
  • 09/08/11 Sheet 7
    • Updated drawing for content and clarity.
  • 09/08/11 Sheet 8
    • Updated drawing for content and clarity.
  • 09/08/11 Sheet 9
    • Updated drawing for content and clarity.

return to top  

 

List of Changes - Customer Reference Specifications
2010 Changes to CRS's are:

6-19-100 Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances

  • 03/19/10 Sheet 1
    • Made into formal title page, content now starts on Sheet 2.
    • Added statement, specifying CRS 6-19-100 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 03/19/10 Sheet 2
    • Added Note 1 - Preapproved List and renumber notes going forward.
  • 03/19/10 Sheet 3
    • In Note 6 (previous Note 5) revised to state connectors are of set-screw type, not compression or set-screw as previously stated.
  • 03/19/10 Sheet 4
    • In Note 8 (previous Note 7) stated when cable limiters are installed set-screw type bus connectors are not required.
    • Corrected table numbering to Table 1 (previously stated Table 4).
    • Table 2 moved to Sheet 5.
  • 03/19/10 Sheet 5
    • Table 4 moved to Sheet 6.
  • 03/19/10 Sheet 6
    • Figure 1 moved to Sheet 7.
  • 03/19/10 Sheet 7
    • Figure 2 moved to Sheet 8.
  • 03/19/10 Sheet 8
    • Figure 3 moved to Sheet 9.
  • 03/19/10 Sheet 9
    • Figure 4 moved to Sheet 10.
  • 03/19/10 Sheet 10
    • Figure 5 moved to Sheet 11.
    • Added note referring grounding bushings to Note 7 (previously Note 6).
  • 03/19/10 Sheet 11
    • Figure 7 moved to Sheet 12 and renumbered to Figure 6.
    • Added note referring grounding bushings to Note 7 (previously Note 6).
  • 03/19/10 Sheet 12
    • Previous Sheet 12 deleted - obsolete.
    • Revised dimensions to state 50" (previously 36") required to the side and rear of terminal compartment if access is required.

6-15-180 Customer Installed Duct System

  • 03/19/10 Sheet 1
    • Made into formal title page, content now starts on sheet 2.
    • Added statement, specifying CRS 6-15-180 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 03/19/10 Sheet 2
    • Updated wording for consistency, final grade to finished grade.
  • 03/19/10 Sheet 4
    • Added language about sweeps to Note 7.
    • Note 9 was note 11 on previous version.
    • All other notes were renumbered accordingly.
  • 03/19/10 Sheet 5
    • Added statement to Note 10 that PPL EU will inspect conduit installation prior to being pulled.
    • Added more detail to Note 10 about tamping concrete to ensure conduits are fully encased.
    • Changed title of Note 12 to Pulling Line.
    • Corrected breaking strength of pulling line from 200 to at least 1200 lbs.
    • Added more detail to Note 12 about pulling line requirements.
  • 03/19/10 Sheet 6
    • Updated Note References.

6-10-165 Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE

  • 03/19/10 Sheet 1
    • Made into formal title page, content now starts on sheet 2.
    • Added statement, specifying CRS 6-10-165 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 03/19/10 Sheet 2
    • Revised Note 7.
  • 03/19/10 Sheet 3
    • Revised Note 14.
  • 03/19/10 Sheet 4
    • Revised Support and Support Brackets #1 sectiion to reference REMSI Sketch #47.
    • Revised Identification Section to include pole label information.
  • 03/19/10 Sheet 5
    • Removed last line of Customer Shall Provide The Following For New Installation #2.
  • 03/19/10 Sheet 7
    • Added more detail to first paragraph.
  • 03/19/10 Sheet 8
    • Added two notes referenced on sheet marked as * and **.
  • 03/19/10 Sheet 9
    • Added one note referenced on sheet marked as *.
    • Updated Dimensions.
    • Noted Drawing is Not to Scale.
  • 03/19/10 Sheet 10
    • Added one note referenced on sheet marked as *.
    • Updated Dimensions.
    • Noted Drawing is Not to Scale.
  • 03/19/10 Sheet 11
    • Noted Drawing is Not to Scale.
  • 03/19/10 Sheet 12
    • Noted Drawing is Not to Scale.
  • 03/19/10 Sheet 13
    • Added one note referenced on sheet marked as *.
    • Updated Dimensions.
    • Noted Drawing is Not to Scale.

6-09-199 Installation Instructions For 3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments In Customer-Owned Switchgear

  • 02/03/10 Sheet 1
    • Made into formal title page, content now starts on sheet 2.
    • Added WYE to title for clarification.
    • Added statement, specifying CRS 6-09-199 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
  • 02/03/10 Sheet 2
    • Extended review period of unapproved switchgear and termination compartments from 60 to 90 days
    • Notes Section 1 – updated statement to include Point of Contact Document reference.
  • 02/03/10 Sheet 3
    • Notes Section 10 – has been expanded to give more detail on conduit runs.
    • Notes Section 12 – hole in door of termination and metering compartments has been changed from ¼" to ½" to accommodate lockable hasp.
  • 02/03/10 Sheet 4
    • Notes Section 15 – detail on PPL EU Phase rotation has been added for clarity.
    • Notes Section 18 – has been added.
    • Notes Section 19 – has been added.
    • Bill of Material Chart has been moved to Sheet 5.
  • 02/03/10 Sheet 5
    • Termination Compartment Drawing has been moved to Sheet 6
    • Removed Reference to REMSI Sketch #37, Sketch has been Voided.
  • 02/03/10 Sheet 6
    • Metering Compartment Drawing has been moved to Sheet 7.
    • Termination Compartment Drawing-Updated minimum working clear space in front of termination compartment to 9'0" from 5'0".
  • 02/03/10 Sheet 7
    • Metering Compartment Drawing-Added references to Note 18 and Note 19.
    • Removed Detail B. Terminal Block is to be attached to Neutral Bar; previously Terminal Block was attached to the side of the Termination Compartment.
    • Updated minimum working clear space in front of metering compartment to 9'0" from 5'0".

 return to top

List of Changes - REMSI RULES - 2011

Rule 1 - 7/29/11

  • Edited Rule 1h
  • Added Rule 1i
  • Re-lettered rule accordingly

Rule 2 - 3/4/11

  • Section B added, following sections re-lettered.
  • Sections E and F (Formerly D and E) revised.
  • Note 6 Revised.

Rule 6 - 10/26/11

  • Section B title Updated
  • Section C title Updated, added last two paragraphs detailing rear lot service requirements

Rule 11B - 10/26/11 Section E - added last paragraph detailing rear lot service requirements

Rule 12 - 7/29/11 Added Section j - Grounding

3/4/11 Section f revised.

Rule 13 - 10/26/11

  • Section B - added exception meter height in flood area
  • Section C - added exception indoor location in flood area

Rule 15 - 8/12/11 Updated to include Sketch #8D and Sketch 16 Series

3/4/11 Corrected terminology
            

          Rule 18 - 8/12/11  Updated to include Sketch #8D and Sketch 16 Series

Rule 19 - 10/26/11 Section G added, re-lettered Cut-In Card Documents to Section H

7/29/11

  • Updated Section b
  • Inserted Section c - Inspection Exemption - Ralroad Not Covered in NEC
  • Re-lettered rule accordingly
  • Updated Cut-In-Cards
Rule 25A - Updated wording in 25A(a)(1) to remove requirement of installation and annual maintenance fees on demand pulse contracts.

return to top

List of Changes - REMSI RULES - 2010

Rule 1 - 7/22/10 Section H and K have been updated.

Rule 15 - 12/23/10 Update and clarify Note H details.

Rule 18 - 12/23/10 Update and clarify Note G details.

Rule 33 - 4/29/10 Added Sections E (Power Quality), F (Harmonics), and G (Harmonics: Criteria to Limit Voltage Distortion Due to Single Customer)


return to top

 

List of Changes - Definitions - 2011

10/26/11 Added/revised the following definition:

  • Roadway

3/4/11 Added/revised the following definitions:

  • Current Transformer Mounting Bridge
  • Foreign Energy Source
  • Junction Box
  • Metering Equipment
  • Point of Interconnection
  • Renewable Energy Source
  • Service Termination Compartment

return to top

 

Approved Metering and Equipment Tables-List of Changes - 2012
01/05 Approved Meter Services Devices - Table 11 – Revised Catalog # for Midwest, R-100C with MSBN1A and RS 250C with MSBN1A.  Added New Model R-102CB2 with MSBN1A

return to top

 

Approved Metering and Equipment Tables-List of Changes - 2011
04/11 Approved Meter Services Devices - Table 11 - Added Eaton to name: Eaton/Cutler Hammer. Added New Approvals Catalog #ECP511B Series, and #ECP521B Series
04/20 Approved Switchgear Metering & Termination Compartments - Table 1 - Added Eaton to name: Eaton/Cutler Hammer. Updated Drawing # 42C1054, Sheets 1, 2, Issued Revision 13

04/20

Approved Switchgear Metering & Termination Compartments - Table 2 - Added Eaton to name: Eaton/Cutler Hammer. Updated Drawing # 42C1054, Sheets 1, 2, Issued Revision 13

05/31

Approved Instrument Transformer Cabinets - Table 6 - Added PENN PANEL as a manufacturer. New catalog listing, PPL-724812

08/12

NEW TABLE - Pad Mounted Metering and Termination Compartment Table

08/12

NEW TABLE - Connector Table

   

return to top

 

Approved Metering and Equipment Tables-List of Changes - 2010
12/15 Approved Meter Services Devices - Table 3 - Added Eaton/Cutler Hammer Catalog #CH9564K7
12/15 Approved Meter Services Devices - Table 4 - Added Eaton/Cutler Hammer Catalog #CH9564K7

12/30

Automatic Transfer Switch Table Updated - additional approved automatic transfer switches added

return to top

10-26-2011