Home    |    myPPL    |    Contact Us    |    Outage Center   |   
Residential    |    Commercial and Industrial    |    Business Partners    |    Community Services
 

Print this page

Print this list

Customer Reference Specifications-List of Changes: 2008, 2005
Complete List of Changes for Sketches: 2008, 2007, 2006, 2005

SKETCH NOTES

NOTE

"PPL" and "Company" will be changed to "PPL EU", "PPL's" and "Company's" will be changed to "PPL EU's".

NOTE 1

All updated sketches have been redrawn for clarity using a new format.

NOTE 2

The 3 phase, 4 wire, 240-single phase 120/240 volts service is now referred to as 3 Phase, 4 Wire, Delta 240/120 Volts.

NOTE 3

Are changing the terms ' meter trough' to 'meter base' and 'meter mounting' to 'meter panel'.

 

Sketch # 2008 Changes, Updates and Additions
60 05/13/08 Meter box to meter base

04/07/08 New Sketch

61

05/13/08 Meter box to meter base

04/07/08 New Sketch

70 04/07/08 New Sketch
71 04/07/08 New Sketch
72 05/13/08 Correction to title - single phase 4 wire to single phase 3 wire

04/07/08 New Sketch
 
73 05/13/08 Updated title

04/07/08 New Sketch
80 04/07/08 New Sketch
81

05/13/08 Note one changed can to shall

04/07/08 New Sketch

 return to top

Sketch # 2007 Changes, Updates and Additions
1 08/17/07 Updated format, content, and added notes

3

0817/07  Updated format, content, and added notes

02/26/07 Corrected Error in Span Length Information

3A 08/17/07 Updated format, content, added notes, and split drawing into two sheets
5 08/27/07 Updated format, content, revised title, and added notes
5A 08/13/07 VOIDED - See Sketch 6
6 08/17/07 Updated format, content, revised title, and added notes
7 08/17/07 Updated format, content, revised title, and added notes
7A

08/17/07  Updated format, content, and added notes

02/26/07 Added No Attachment Sticker To Sketch

8 08/17/07 Updated format, content, revised title, and added notes
10A 08/13/07 Updated format, content, revised title, split drawing into two sheets
12 08/13/07 Updated format, content, revised title, split drawing into two sheets
14 08/17/07 Updated format, and revised graphic

16A

02/01/07 Specified in note 9 that the neutral bar and all metallic conduit must be bonded together and to the cabinet.

17 08/17/07 Updated format, content, revised title, and added notes

25A

04/16/07 Format updated.

return to top

Sketch # 2006 Changes, Updates and Additions
1A 11/01/06 Updated format, updated service bracket to new design.

3

11/10/06 Updated format, expanded table, updated drawing.

5 04/26/06 Deleted grounding connection from the meter base to the ground rod. Added grounding connection from the service disconnect to the ground rod.
5A 04/26/06 Deleted ground wire that runs along the pole and connects to ground rod. Added grounding connection from the service disconnect to the ground rod.
7A

12/08/06 Added Cantex as a new approved slip riser manufacturer.

04/13/06 Deleted 'Residential' from title. Revised sketch to show second conduit strap above grade 3. Referenced sketches 55 and 55A. Referenced CRS 6-19-133, CRS 6-19-134, Rules 5, 6, 10, 11B, 13, and 14.

02/13/06 Added IPEX as a new approved slip riser manufacturer. 

01/30/06 Added Note 3. Added Carlon as approved manufacturer of the slip riser.

8

02/13/06 Added 'requires approval from supervisor-metering services. Not for new construction after 5/1/2006.'

8B 02/13/06 Added 'not for new construction after 5/1/2006.'
8C 10/09/06 Minimum clear space changed from 15" to 18" and update of format.

9

02/13/06 Added 'requires approval from supervisor-metering services. Not for new construction after 5/1/2006.'

10

03/06/06 Added 'not for construction after 5/1/06.' Added 'for temporary service.'

10A

03/06/06 Added 'not for construction after 5/1/06.' Added 'for temporary service.' Title change to specifty 'service over 400A' for 120/208V and 'instrument transformer metering for service over 600A' for 120/240V.

11

03/06/06 Added 'not for construction after 5/1/06.' Added 'for temporary service.'

12

03/06/06 Added 'not for construction after 5/1/06.' Added 'for temporary service.'

13

03/06/06 Added 'not for construction after 5/1/06.' Added 'for temporary service.'

14

08/18/06 Changed Benelex to CT Mounting.

14A

08/18/06 Changed Benelex to CT Mounting, 800A Max to 1200A Max, and cabinet size from 36" x 36" x 12" to 48" x 48" x 12".

14B

08/18/06 Changed Benelex to CT Mounting.

14C 02/13/06 Specified 'Overhead' in the title.
14D 02/13/06 Specified 'Overhead' in the title.

15

08/18/06 Changed Benelex to CT Mounting and specified Underground to the title.

15A

08/18/06 Changed Benelex to CT Mounting and specified Underground to the title.

16A

11/10/06 Updated format, drawing, detail and notes. Expanded Sketch to 3 sheets, added close up detail of Neutral Bar, added foundation details.

18

08/18/06 Added Rule 12 reference, on page 1 changed the 24" radius elbow to a 36" radius steel elbow, on page 2 changed the 36" min radius elbow to specify that it is a steel elbow.

21

12/18/06 Updated format, added "Notice: On May 1, 2007 the following change will be made to Sketch 21. Minimum vertical distance between bushings of incoming service lateral conduits to line side terminal will change from 36" to 48" as measured from the top of the conduit to the middle of the bottom bolt holder on the bus bar." Added comment that the bus can be rotated by 90 degrees, expanded sketch to 2 pages.

22 10/09/06 Voided.
27 08/31/06 Updated sketch and added catalog numbers and WMS CU.
29B 10/09/06 Added 'Requires approval from supervisor - metering services', updated format.
29C 10/09/06 Added 'Requires approval from supervisor - metering services', updated format.

36

02/13/06 Deleted 'Requires approval by supervisor of metering services.'

38

08/18/06 Marked as Not For New Construction.

41

11/10/06 New Sketch.

41A

11/10/06 New Sketch.

41B

11/10/06 New Sketch.

41C

11/10/06 New Sketch.

55

09/22/06 Corrected spelling error.

08/18/06 Updated for clarity.

06/01/06 Changed PPL to PPL Electric Utilities.

55A

08/18/06 Added the finished grade line and specified 5 feet from the center of the meter base to the finished grade, changed note 1 to specify that the minimum of 3 feet is to be in any direction from the meter base.

06/01/06 Changed PPL to PPL Electric Utilities and PPL's to PPL's Electric Utilities.

return to top

Sketch # 2005 Changes, Updates and Additions

1

07/12/05 Added 'new' in item 1 and deleted notes 1 and 2.

1A

07/08/05 Updated sketch to new format for clarity-new sheet generated. Deleted 'anchor, expansion, 3/8" x 5" (old item 7).' Renumbered item 13 as item 7. Replaced company with PPL. Added 'new' in item 1. Deleted notes 1 and 2.

3

07/08/05 Sketch updated to new format for clarity. Deleted 'see rule 4 for minimum height and attachment height above roof for weather head and conduits.' Added wire sizes for for each service size.

7A

09/14/05 New sketch generated. Slip Riser for Installation on Single Phase Underground Residential Services.

8B

07/12/05 Added 'greater than 2000 A' to title and 'prior' to subtitle.

14C

07/07/05 New sketch generated.

14D

07/12/05 New sketch generated.

27

07/07/05 Changed mete to metering.

37

06/23/05 This sketch was voided, please see CRS 6-09-199.

39

07/08/05 Referenced CRS 6-09-199 in note 3 and changed company to PPL.

46

03/11/05 Sketch redrawn in new format for clarity.

48

02/22/05 Sketch redrawn in new format for clarity.

49

04/11/05 Sketch updated to new format for clarity. Distinguished between mounting holes and conductors. Updated tables.

49A

02/22/05 Sketch updated to new format for clarity.

return to top

List of Changes - Customer Reference Specifications
2008 Changes to CRS's are:

6-18-115 Installation Instructions for Customer-Installed Conduit Systems on PPL Terminal Poles

  • 03/31/08 A new conduit bracket has been added to section 115
  • 03/31/08 New number Replacing CRS 402C-115 which replaced CRS-1005
2005 Significant changes to the various CRS's are:

6-09-192 (12 kV 3-Phase Service Interrupter Switch on Customer-Owned Pole, Overhead to Underground Supply.

  • 07/27/05 Sheet 1-Stated the correct departments, Metering Services and Field Services, required to approve deviations. Updated to new format for clarity.
  • 07/27/05 Sheet 2-Updated to new format for clarity.
  • 07/27/05 Sheet 3-Updated to new format for clarity.
  • 07/27/05 Sheet 4-Deleted all ABB (Westinghouse) switch and fuse materials previously used. Updated to new format for clarity.
  • 07/27/05 Sheet 5-Specified wire sized on sketch. Deleted reference to ABB (Westinghouse) framing. Updated to new format for clarity.
  • 07/27/05 Sheet 6-Deleted ABB (Westinghouse) framing and specified wire sizes on sketch. Specified maximum design tension. Updated to new format for clarity.

6-09-193 (12 kV 3-Phase Service Fused Interrupter Switch & Metering On Customer-Owned Pole, Overhead Supply to Overhead.

  • 09/28/05 Sheet 1-Corrected the department names to contact for approval.
  • 09/28/05 Sheet 2-Added note 5 to specify 2 locks on switch handle to enable switch access for PPL and customer.
  • 09/28/05 Sheet 3-Updated to new format for clarity.
  • 09/28/05 Sheet 4-Deleted all ABB (Westinghouse) switch and fuse materials previously used.
  • 09/28/05 Sheet 5-Deleted all ABB (Westinghouse) switch and fuse materials previously used. This sheet contained only Westinghouse switch and fuse information, therefore the specification will be reduced from 9 sheets to 8 sheets.
  • 09/28/05 Sheet 6-Specified wire sizes on framing.
  • 09/28/05 Sheet 7-Specified wire sizes on framing. Deleted Westinghouse framing.
  • 09/28/05 Sheet 8-Specified wire sizes on framing.

6-09-194 (12kV 3 Phase Service Fused Interrupter Switch on Customer-Owned Pole, Overhead Supply to Overhead)

  • 09/28/05 Sheet 1- Corrected the names of departments to contact for approval.
  • 09/28/05 Sheet 2-Added note 5 to specify 2 locks on switch handle to enable switch access for PPL and customer.
  • 09/28/05 Sheet 3-Updated to new format for clarity.
  • 09/28/05 Sheet 4-Deleted all ABB (Westinghouse) switch and fuse materials previously used.
  • 09/28/05 Sheet 5-Specified wire sizes on S&C Co. framing. Deleted reference to Westinghouse framing.
  • 09/28/05 Sheet 6-Specified wire sizes on framing.
  • 09/28/05 Sheet 7-Deleted Westinghouse framing.

6-09-199 (Installation Instructions for 12kV 3-Phase 4-Wire Service Termination and Metering Compartments in Customer-Owned Switchgear)

  • 05/02/05 Sheet 1-Customer to provide open front and open side views of metering and termination compartments and a one line drawing of switchgear arrangement. Stated approval time for any switchgear or termination compartment not listed as approved in the REMSI Rule Book.
  • 05/02/05 Sheet 2-All minimum clearances in note 3 must be maintained. Insulating barriers are not permitted to reduce minimum clearances. Specified that a hinged full-length metal screen barrier must be placed in the termination compartment. Referenced new detail in note 8.
  • 05/02/05 Sheet 3-Added note 17 to specify the ampacity sizing of the point of contact in switchgear and the clearing time of a fault. Revised note 13 and referenced new detail.
  • 05/02/05 Sheet 4-Added equivalent plastic wireway to item 1 in table.
  • 05/02/05 Sheet 5-New features added to sketch for clarity. Stated that ground and neutral busses must be bonded together in the termination compartment only and that all minimum clearances must be maintained (insulating barriers are not permitted). Added detail A.
  • 05/02/05 Sheet 6-Added new features to sketch for clarity and detail B. Specified insulation level for the insulator that the neutral bus is mounted on. Stated that all minimum clearances must be maintained.

NOTE: A new sheet was generated for CRS 6-09-199 due to the additions of note 17 on sheet 3, totaling 6 sheets.

6-15-160 (Customer Installed Precast Manhole)

  • 05/02/05 Sheet 1-Updated associated specifications.
  • 05/02/05 Sheet 2-Precast concrete supplier added to approved list.

6-15-180 (Customer Installed Duct System)

  • 05/02/05 Sheet 1-Updated associated specifications.
  • 05/02/05 Sheet 2-Changed "other underground facilities" to "existing Underground facilities".
  • 05/02/05 Sheet 3-Created new sheet 3, created new note 4 "Joint Trench Electric and Communication". Existing note 4 changed to note 5.
  • 05/02/05 Sheet 4-Current sheet 3 changed to sheet 4, notes 5 through 11 changed to 6 through 12.
  • 05/02/05 Sheets 5-9-Current sheets 4-8 changed to 5-9. Various note numbers changed on drawings to reflect addition of new note 4 and change of order to existing notes.

return to top

5/2008

Connect Newsletter  |  Privacy Policy  |  Search  |  Survey  |  Terms & Conditions | © 2008 PPL Corporation. All Rights Reserved.