|
| SKETCH NOTES |
|
NOTE |
"PPL" and "Company" will be changed to "PPL EU", "PPL's" and "Company's" will be changed to "PPL EU's". |
|
NOTE 1 |
All updated sketches have been redrawn for clarity using a new format. |
|
NOTE 2 |
The 3 phase, 4 wire, 240-single phase 120/240 volts service is now referred to as 3 Phase, 4 Wire, Delta 240/120 Volts. |
|
NOTE 3 |
Are changing the terms ' meter trough' to 'meter base' and 'meter mounting' to 'meter panel'. |
| Sketch # |
2011 Changes, Updates and Additions |
| 3B |
03/18/11 Updated Format and Content |
| 7 |
03/18/11 Updated Format and Content |
| 7B |
03/18/11 New Sketch |
| 8C |
08/12/11 Updated Format & Content |
| 8D |
08/12/11 New Sketch |
|
Sketch 16 Series - Sketch 16A has been revised, reformatted and updated into a series of sketches:
- Sketch 16 - up to and including 2000A - 8 conduits
- Sketch 16A - up to and including 3000A - 12 conduits
- Sketch 16B - up to and including 4000A - 16 conduits
|
| 20 |
08/12/11 New Sketch |
| 49 |
08/12/11 Updated Title & Format |
| 54A |
08/12/11 Updated Title & Format |
| 55 |
08/12/11 Updated Format & Content |
| Distributed Generation Sketch Series have been updated, expanded and renumbered for organization. Each sheet has had content updated or in new. The new Distributed Generation Series is as follows: |
|
Distributed Generation Organization Map |
| Metering Type |
Voltage |
Load Center Bus Bar Rating |
Sketch # |
| Self-Contained |
Less than 480 V |
Up to and Including 20% |
56 |
| Over 20% |
56A |
| 480V Self-Contained |
480 V |
Up to and Including 20% |
57 |
| Over 20% |
57A |
| CT/Secondary |
Less than 600 V |
Up to and Including 20% |
58 |
| Over 20% |
58A |
| 12 kV |
12 kV |
Pole Mount |
Up to and Including 20% |
59 |
| Over 20% |
59A |
| Switchgear |
All Options |
59B | |
return to top
| Sketch # |
2010 Changes, Updates and Additions |
| 19 |
04/07/10 New Sketch |
| 25C |
04/30/10 Corrected Format, updated drawings, revised title for clarity, added Detail Box |
| 25D |
04/30/10 Corrected Format, updated drawings, revised title for clarity, added Detail Box |
| 41 Series |
09/17/10 Transfer Switches have been updated and reorganized. |
41P1
41P2
41AP1
41AP2
|
09/17/10 the notes section has been expanded, the drawing updated accordingly and the detail box added. |
41BP1
41BP2
41CP1
41CP2
41DP1
41EP1 |
09/17/10 renumbered to mimic organization of previous 41 Series Sketches. Notes have been expanded, the drawing updated accordingly and the detail box added.
Old Numbering: Sketch 41P1 – Manual Transfer Switch – Partial Load – Less than 600V Sketch 41P2 – Manual Transfer Switch – Full Load – Less than 600V Sketch 41AP1 – Automatic Transfer Switch – Partial Load – Less than 600V Sketch 41AP2 – Automatic Transfer Switch – Full Load – Less than 600V Sketch 41BP1 – Manual or Automatic Transfer Switch - Partial Load – 12KV Load Center Sketch 41BP2 – Automatic Transfer Switch – Full Load – 12KV Load Center Sketch 41BP3 – Manual or Automatic Transfer Switch – 12KV Switchgear Sketch 41CP1 – Manual or Automatic Transfer Switch – 12KV Switchgear
New Numbering: Sketch 41P1 – Manual Transfer Switch – Partial Load – Less than 600V Sketch 41P2 – Manual Transfer Switch – Full Load – Less than 600V Sketch 41AP1 – Automatic Transfer Switch – Partial Load – Less than 600V Sketch 41AP2 – Automatic Transfer Switch – Full Load – Less than 600V Sketch 41BP1 – Manual Transfer Switch – Partial Load – 12KV Load Center Sketch 41BP2 – Manual Transfer Switch – Full Load – 12KV Load Center Sketch 41CP1 – Automatic Transfer Switch – Partial Load – 12KV Load Center Sketch 41CP2 – Automatic Transfer Switch – Full Load – 12KV Load Center Sketch 41DP1 – Manual Transfer Switch – 12KV Switchgear Sketch 41EP1 – Automatic Transfer Switch – 12KV Switchgear |
56P1
56P2 |
10/22/10 Corrected Rule Reference 26 to Rule Reference 28
09/17/10 New Sketches
Sketch 56P1 – Distributed Generation Sketch - Under 20% Load Center Bus Bar Rating – Less than 600V Sketch 56P2 – Distributed Generation Sketch - Over 20% Load Center Bus Bar Rating – Less than 600V |
56AP1
56AP2
56BP1 |
10/22/10 Corrected Rule Reference 26 to Rule Reference 28
10/15/10 New Sketches
Sketch 56AP1 – Distributed Generation Sketch - Under 20% Load Center Bus Bar Rating – 12KV Sketch 56AP2 – Distributed Generation Sketch - Over 20% Load Center Bus Bar Rating – 12KV Sketch 56BP1 – Distributed Generation Sketch - Under 20% Load Center Bus Bar Rating |
return to top
| List of Changes - Customer Reference Specifications |
| 2012 Changes to CRS's are: |
6-10-165 Outdoor Lighting - Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE
- 10/31/11 Sheet 1-16
- Updated wordings of general notes and updated numbers in Sheets 2 and 3.
- Updated last paragraph in Sheet 4.
- Updated sheet numbers in Sheet 5.
- Updated figure and sheet number in Sheet 6.
- Updated last paragraph and figures number on Sheet 7.
- Updated sheet numbers in Sheet 8.
- Updated figure and sheet number in Sheet 9.
- Updated diagram label in Sheet 10.
- Updated diagram label in Sheet 11.
- Updated diagram clearance in Sheet 12.
- Updated figure number and updated diagram in Sheet 13.
- Updated diagram label and dimensions. Updated format in Sheet 15.
- Updated figures, number and fonts.
|
return to top
| List of Changes - Customer Reference Specifications |
| 2011 Changes to CRS's are: |
6-09-194 Overhead Service to Overhead
- 09/08/11 Sheet 1
- Made into formal title page, content now starts on Sheet 2.
- Added statement, specifying CRS 6-09-194 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 09/08/11 Sheet 2
- Split Note 1 into Note 1 and 2.
- Re-numbered notes accordingly.
- Updated new Note 4 - ground wire comes from the lightning arrestor cross arm.
- 09/08/11 Sheet 3
- Updated Bill of Material to meet current requirements.
- 09/08/11 Sheet 4
- Updated Bill of Material to meet current requirements.
- 09/08/11 Sheet 5
- Updated drawing notes to match Bill of Material changes.
- 09/08/11 Sheet 6
- Updated drawing notes to match Bill of Material changes.
- 09/08/11 Sheet 7
- Metering Compartment Drawing - added references to Note 18 and Note 19.
- Removed Detail B. Terminal block is to be attached to neutral bar; previously terminal block was attached to the side of the termination compartment.
- Updated minimum working clear space in front of metering compartment to 9' 0" from 5' 0".
|
6-09-199 Installation Instructions For 3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments in Customer-Owned Switchgear
- 09/08/11 Sheet 5
- Bill of Material item 3 updated.
- 09/08/11 Sheet 7
- Updated drawing - VT's to be mounted on shelf instead of on back of metering compartment.
|
6-14-121 Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Only Electric Lines (Non-Joint Trench)
- 09/08/11 Sheet 1
- Updated title.
- Made into formal title page, content now starts on Sheet 2.
- Added statement, specifying CRS 6-14-121 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 09/08/11 Sheet 2
- Added reference to CRS 6-15-180.
- Updated information in Note 2.
- 09/08/11 Sheet 4
- Added flow-able fill as a select backfill option
- 09/08/11 Sheet 5
- Notes expanded to Sheet 5, all pages from this point forward were renumbered accordingly.
- 09/08/11 Sheet 6
- Updated drawing notes and added more detail on dimensions.
- 09/08/11 Sheet 7
- Updated drawing for content and clarity.
|
6-14-122 Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Electric and/or Gas, Telecommunication Lines (Joint Trench)
- 09/08/11 Sheet 1
- Updated title.
- Made into formal title page, content now starts on Sheet 2.
- Added statement, specifying CRS 6-14-122 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 09/08/11 Sheet 2
- Added reference to CRS 6-15-180.
- Updated information in Note 2.
- 09/08/11 Sheet 4
- Added flow-able fill s a select backfill option.
- 09/08/11 Sheet 5
- Notes expanded to Sheet 5, all pages from this point forward were renumbered accordingly.
- 09/08/11 Sheet 6
- Updated drawing notes and added more detail on dimensions.
- 09/08/11 Sheet 7
- Updated drawing for content and clarity.
- 09/08/11 Sheet 8
- Updated drawing for content and clarity.
- 09/08/11 Sheet 9
- Updated drawing for content and clarity.
|
return to top
| List of Changes - Customer Reference Specifications |
| 2010 Changes to CRS's are: |
6-19-100 Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances
- 03/19/10 Sheet 1
- Made into formal title page, content now starts on Sheet 2.
- Added statement, specifying CRS 6-19-100 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 03/19/10 Sheet 2
- Added Note 1 - Preapproved List and renumber notes going forward.
- 03/19/10 Sheet 3
- In Note 6 (previous Note 5) revised to state connectors are of set-screw type, not compression or set-screw as previously stated.
- 03/19/10 Sheet 4
- In Note 8 (previous Note 7) stated when cable limiters are installed set-screw type bus connectors are not required.
- Corrected table numbering to Table 1 (previously stated Table 4).
- Table 2 moved to Sheet 5.
- 03/19/10 Sheet 5
- Table 4 moved to Sheet 6.
- 03/19/10 Sheet 6
- Figure 1 moved to Sheet 7.
- 03/19/10 Sheet 7
- Figure 2 moved to Sheet 8.
- 03/19/10 Sheet 8
- Figure 3 moved to Sheet 9.
- 03/19/10 Sheet 9
- Figure 4 moved to Sheet 10.
- 03/19/10 Sheet 10
- Figure 5 moved to Sheet 11.
- Added note referring grounding bushings to Note 7 (previously Note 6).
- 03/19/10 Sheet 11
- Figure 7 moved to Sheet 12 and renumbered to Figure 6.
- Added note referring grounding bushings to Note 7 (previously Note 6).
- 03/19/10 Sheet 12
- Previous Sheet 12 deleted - obsolete.
- Revised dimensions to state 50" (previously 36") required to the side and rear of terminal compartment if access is required.
|
6-15-180 Customer Installed Duct System
- 03/19/10 Sheet 1
- Made into formal title page, content now starts on sheet 2.
- Added statement, specifying CRS 6-15-180 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 03/19/10 Sheet 2
- Updated wording for consistency, final grade to finished grade.
- 03/19/10 Sheet 4
- Added language about sweeps to Note 7.
- Note 9 was note 11 on previous version.
- All other notes were renumbered accordingly.
- 03/19/10 Sheet 5
- Added statement to Note 10 that PPL EU will inspect conduit installation prior to being pulled.
- Added more detail to Note 10 about tamping concrete to ensure conduits are fully encased.
- Changed title of Note 12 to Pulling Line.
- Corrected breaking strength of pulling line from 200 to at least 1200 lbs.
- Added more detail to Note 12 about pulling line requirements.
- 03/19/10 Sheet 6
|
6-10-165 Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE
- 03/19/10 Sheet 1
- Made into formal title page, content now starts on sheet 2.
- Added statement, specifying CRS 6-10-165 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 03/19/10 Sheet 2
- 03/19/10 Sheet 3
- 03/19/10 Sheet 4
- Revised Support and Support Brackets #1 sectiion to reference REMSI Sketch #47.
- Revised Identification Section to include pole label information.
- 03/19/10 Sheet 5
- Removed last line of Customer Shall Provide The Following For New Installation #2.
- 03/19/10 Sheet 7
- Added more detail to first paragraph.
- 03/19/10 Sheet 8
- Added two notes referenced on sheet marked as * and **.
- 03/19/10 Sheet 9
- Added one note referenced on sheet marked as *.
- Updated Dimensions.
- Noted Drawing is Not to Scale.
- 03/19/10 Sheet 10
- Added one note referenced on sheet marked as *.
- Updated Dimensions.
- Noted Drawing is Not to Scale.
- 03/19/10 Sheet 11
- Noted Drawing is Not to Scale.
- 03/19/10 Sheet 12
- Noted Drawing is Not to Scale.
- 03/19/10 Sheet 13
- Added one note referenced on sheet marked as *.
- Updated Dimensions.
- Noted Drawing is Not to Scale.
|
6-09-199 Installation Instructions For 3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments In Customer-Owned Switchgear
- 02/03/10 Sheet 1
- Made into formal title page, content now starts on sheet 2.
- Added WYE to title for clarification.
- Added statement, specifying CRS 6-09-199 is part of the Rules for Electric Meter and Service Installation (REMSI) Website.
- 02/03/10 Sheet 2
- Extended review period of unapproved switchgear and termination compartments from 60 to 90 days
- Notes Section 1 – updated statement to include Point of Contact Document reference.
- 02/03/10 Sheet 3
- Notes Section 10 – has been expanded to give more detail on conduit runs.
- Notes Section 12 – hole in door of termination and metering compartments has been changed from ¼" to ½" to accommodate lockable hasp.
- 02/03/10 Sheet 4
- Notes Section 15 – detail on PPL EU Phase rotation has been added for clarity.
- Notes Section 18 – has been added.
- Notes Section 19 – has been added.
- Bill of Material Chart has been moved to Sheet 5.
- 02/03/10 Sheet 5
- Termination Compartment Drawing has been moved to Sheet 6
- Removed Reference to REMSI Sketch #37, Sketch has been Voided.
- 02/03/10 Sheet 6
- Metering Compartment Drawing has been moved to Sheet 7.
- Termination Compartment Drawing-Updated minimum working clear space in front of termination compartment to 9'0" from 5'0".
- 02/03/10 Sheet 7
- Metering Compartment Drawing-Added references to Note 18 and Note 19.
- Removed Detail B. Terminal Block is to be attached to Neutral Bar; previously Terminal Block was attached to the side of the Termination Compartment.
- Updated minimum working clear space in front of metering compartment to 9'0" from 5'0".
|
return to top
| List of Changes - REMSI RULES - 2011 |
|
Rule 1 - 7/29/11
- Edited Rule 1h
- Added Rule 1i
- Re-lettered rule accordingly
|
Rule 2 - 3/4/11
- Section B added, following sections re-lettered.
- Sections E and F (Formerly D and E) revised.
- Note 6 Revised.
|
Rule 6 - 10/26/11
- Section B title Updated
- Section C title Updated, added last two paragraphs detailing rear lot service requirements
|
Rule 11B - 10/26/11 Section E - added last paragraph detailing rear lot service requirements |
Rule 12 - 7/29/11 Added Section j - Grounding
3/4/11 Section f revised. |
Rule 13 - 10/26/11
- Section B - added exception meter height in flood area
- Section C - added exception indoor location in flood area
|
Rule 15 - 8/12/11 Updated to include Sketch #8D and Sketch 16 Series
3/4/11 Corrected terminology |
|
Rule 18 - 8/12/11 Updated to include Sketch #8D and Sketch 16 Series
|
Rule 19 - 10/26/11 Section G added, re-lettered Cut-In Card Documents to Section H
7/29/11
- Updated Section b
- Inserted Section c - Inspection Exemption - Ralroad Not Covered in NEC
- Re-lettered rule accordingly
- Updated Cut-In-Cards
|
Rule 25A - Updated wording in 25A(a)(1) to remove requirement of installation and annual maintenance fees on demand pulse contracts. |
return to top
| List of Changes - REMSI RULES - 2010 |
Rule 1 - 7/22/10 Section H and K have been updated. |
Rule 15 - 12/23/10 Update and clarify Note H details. |
Rule 18 - 12/23/10 Update and clarify Note G details. |
Rule 33 - 4/29/10 Added Sections E (Power Quality), F (Harmonics), and G (Harmonics: Criteria to Limit Voltage Distortion Due to Single Customer) |
return to top
| List of Changes - Definitions - 2011 |
10/26/11 Added/revised the following definition:
3/4/11 Added/revised the following definitions:
- Current Transformer Mounting Bridge
- Foreign Energy Source
- Junction Box
- Metering Equipment
- Point of Interconnection
- Renewable Energy Source
- Service Termination Compartment
|
return to top
| Approved Metering and Equipment Tables-List of Changes - 2012 |
| 01/05 |
Approved Meter Services Devices - Table 11 – Revised Catalog # for Midwest, R-100C with MSBN1A and RS 250C with MSBN1A. Added New Model R-102CB2 with MSBN1A |
return to top
| Approved Metering and Equipment Tables-List of Changes - 2011 |
| 04/11 |
Approved Meter Services Devices - Table 11 - Added Eaton to name: Eaton/Cutler Hammer. Added New Approvals Catalog #ECP511B Series, and #ECP521B Series |
| 04/20 |
Approved Switchgear Metering & Termination Compartments - Table 1 - Added Eaton to name: Eaton/Cutler Hammer. Updated Drawing # 42C1054, Sheets 1, 2, Issued Revision 13 |
|
04/20 |
Approved Switchgear Metering & Termination Compartments - Table 2 - Added Eaton to name: Eaton/Cutler Hammer. Updated Drawing # 42C1054, Sheets 1, 2, Issued Revision 13 |
|
05/31 |
Approved Instrument Transformer Cabinets - Table 6 - Added PENN PANEL as a manufacturer. New catalog listing, PPL-724812 |
|
08/12 |
NEW TABLE - Pad Mounted Metering and Termination Compartment Table |
|
08/12 |
NEW TABLE - Connector Table |
| |
|
return to top
| Approved Metering and Equipment Tables-List of Changes - 2010 |
| 12/15 |
Approved Meter Services Devices - Table 3 - Added Eaton/Cutler Hammer Catalog #CH9564K7 |
| 12/15 |
Approved Meter Services Devices - Table 4 - Added Eaton/Cutler Hammer Catalog #CH9564K7 |
|
12/30 |
Automatic Transfer Switch Table Updated - additional approved automatic transfer switches added |
return to top
10-26-2011
|