Customer Reference Specifications-List of Changes: 2008
Complete List of Changes for Sketches:2009, 2008, 2007

SKETCH NOTES

NOTE

"PPL" and "Company" will be changed to "PPL EU", "PPL's" and "Company's" will be changed to "PPL EU's".

NOTE 1

All updated sketches have been redrawn for clarity using a new format.

NOTE 2

The 3 phase, 4 wire, 240-single phase 120/240 volts service is now referred to as 3 Phase, 4 Wire, Delta 240/120 Volts.

NOTE 3

Are changing the terms ' meter trough' to 'meter base' and 'meter mounting' to 'meter panel'.

 

Sketch # 2009 Changes, Updates and Additions
15A 06/24/09 Updated format, rule references and updated drawing
21 06/24/09 Updated format, rule references and updated drawing
60

03/25/09 Corrected Wording in Note J

03/6/09
Added Note J

61

03/25/09 Corrected Wording in Note J

03/6/09 Added Note J

70 03/25/09 Corrected Wording in Note D

03/6/09 Added Note D and expanded rom two sheets to three sheets
72

03/25/09 Corrected Wording in Note N

03/6/09 Added Note N

73 03/25/09 Corrected Wording in Note I

03/6/09 Added Note I and expanded rom two sheets to three sheets
80

03/25/09 Corrected Wording in Note I

03/6/09 Added Note I

81

03/25/09 Corrected Wording in Note I

03/6/09 Added Note I

82 03/25/09 Corrected Wording in Note I

03/6/09 Added Note I
83 03/25/09 Corrected Wording in Note I

03/6/09 Added Note I

 

Sketch # 2008 Changes, Updates and Additions
7A 12/05/08 Updated format.  Remove Manufacture List (Replaced by Slip Riser Table), changed hole size of Note E and F from 1-1" hole to 2-1/4" holes
8B 09/17/08 Updated format, rule references and updated drawing
14 09/17/08 Updated format, specified note C is not for PPL EU Cables
14A

12/5/08 Update format. Update Title

09/17/08 Updated format, updated drawing to show 3 fingers

14B 09/17/08 Updated format, specified note C is not for PPL EU Cables
14C 09/17/08 Updated format, and updated drawing
14D 09/17/08 Updated format, and updated drawing
15 09/10/08 Updated format; specified note C is not for PPL EU Cables
15A 09/10/08 Updated format, specified note C is not for PPL EU Cables
25 09/17/08 Updated format and rule references
25A 09/17/08 Updated format and rule references
25B New Sketch
25C New Sketch
25D New Sketch
41 12/5/08 Updated format. Add Reference to REMSI Rule 12
41A 12/5/08 Updated format. Add Reference to REMSI Rule 12
41B 12/5/08 Updated format. Add Reference to REMSI Rule 12
41C 12/5/08 Updated format. Add Reference to REMSI Rule 12
47 09/10/08 Updated format; added timber option to sketch
49 09/10/08 Updated format; removed Frankel AML Series; revised drawing to show 4 mounting holes
55 12/05/08 Update Format, updated sketch to specify Horizontal Distances between the Electric Meter and the Gas Meter/Regulator/Relief Valve
55A 12/05/08 Update Format, Change Title, added Note E and F, added references
60

12/05/08 Changed hole size of Note F and G from 1 - 1" hole to 2 - 1/4" holes

05/13/08 Meter box to meter base

04/07/08 New Sketch

61

12/05/08 Changed hole size of Note F and G from 1 - 1" hole to 2 - 1/4" holes

05/13/08 Meter box to meter base

04/07/08 New Sketch

70 04/07/08 New Sketch
71

12/05/08 Added Note 1, added references

04/07/08 New Sketch

72

12/05/08 Added Note M, added references

05/13/08 Correction to title - single phase 4 wire to single phase 3 wire

04/07/08 New Sketch

73 05/13/08 Updated title

04/07/08 New Sketch
80

12/05/08 Corrected spelling error. Corrected incorrect reference in the drawing

04/07/08 New Sketch

81

05/13/08 Note one changed can to shall

04/07/08 New Sketch

82 12/05/08 New Sketch - Typical Arrangement of Outdoor Metering Equipment on Building from Overhead Distribution. Three Phase 277/480Y Volts Self Contained 200A. Combination Circuit Breaker/Meter Base
83 12/05/08 New Sketch - Typical Arrangement of Outdoor Metering Equipment on Building, Lateral from Overhead or Underground Distribution. Three Phase 277/480Y Volts Self Contained 200A. Combination Circuit Breaker/Meter Base

 return to top

Sketch # 2007 Changes, Updates and Additions
1 08/17/07 Updated format, content, and added notes

3

0817/07  Updated format, content, and added notes

02/26/07 Corrected Error in Span Length Information

3A 08/17/07 Updated format, content, added notes, and split drawing into two sheets
5 08/27/07 Updated format, content, revised title, and added notes
5A 08/13/07 VOIDED - See Sketch 6
6 08/17/07 Updated format, content, revised title, and added notes
7 08/17/07 Updated format, content, revised title, and added notes
7A

08/17/07  Updated format, content, and added notes

02/26/07 Added No Attachment Sticker To Sketch

8 08/17/07 Updated format, content, revised title, and added notes
10A 08/13/07 Updated format, content, revised title, split drawing into two sheets
12 08/13/07 Updated format, content, revised title, split drawing into two sheets
14 08/17/07 Updated format, and revised graphic

16A

02/01/07 Specified in note 9 that the neutral bar and all metallic conduit must be bonded together and to the cabinet.

17 08/17/07 Updated format, content, revised title, and added notes

25A

04/16/07 Format updated.

return to top

 

List of Changes - Customer Reference Specifications
2008 Changes to CRS's are:

6-18-115 Installation Instructions for Customer-Installed Conduit Systems on PPL Terminal Poles

  • 03/31/08 A new conduit bracket has been added to section 115
  • 03/31/08 New number Replacing CRS 402C-115 which replaced CRS-1005

6-22-187 Installation Instructions for 3-Phase, 200 AMP Switchgear Foundation

  • 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-187 which replaced CRS-1006

6-22-197 Installation Instructions for 3-Phase, 600 AMP Switchgear Foundation

  • 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-197 which replaced CRS-1007

6-22-198 Installation Instructions for Precast Concrete Foundation for 3-Phase Pad-Mounted Manual or Automatic Source Transfer Switch

  • 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-198

6-22-199 PPL EU Ultra Service Park Typical Utility Plan

  • 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-199 which replaced CRS-1008