Untitled Document

 

Self-Contained 480V Metering Series Organization Map

 

Phase
Current (A)
Service Conductor Entrance
Description
Sketch #
1
200
Underground
Typical Arrangement
60 
400
Typical Arrangement
1 or 3
200 or 400
Overhead (Metering On Pole)
Typical Arrangement
Underground
Switchgear
Overhead or Underground
Wire Trough
Overhead
Typical Arrangement
3
200
Underground
Typical Arrangement
Combination Line Side Breaker/Meter Base
Overhead
Combination Line Side Breaker/Meter Base
400
Underground
Typical Arrangement