Table 12
(print from .pdf)
Effective April 2, 2003
Updates All Previous Tables
SPECIAL METERING APPLICATIONS SINGLE PHASE, SINGLE POSITION OVERHEAD & UNDERGROUND SERVICE 120/240 or 208/120 Volt 100 Amp 4 or 5 Terminal |
 |
|
USER & APPLICATION |
EQUIPMENT MANUFACTURER & CATALOG # |
NOTES |
|
|
SPRINT |
|
Pair Gain Sites |
Champion Products:
- Pad Mounted: UPX-PED100
- Wall or Pole Mounted: UPX-PED101
|
Both units contain a Milbank ringless socket with lever bypass. Contains 100 amp main service breaker.
|
|
OMNIPOINT |
|
PCS Sites |
Square D Company:
- QC816F200CH
Meter Socket/Load Center with optional QCGK2 generator kit. |
Ringless meter socket with horn bypasses. Contains 100 amp main service breaker.
|
|
RCN |
|
Cable Power Supply Site |
Alpha Technologies Powering Package |
Ringless meter socket. L&G #UAS877-PPZA Contains 1-20 amp main service breaker. Uses 3" conduit for UG service. |
View Picture |
|
LAMAR ADVERTISING |
|
Bus Stop Shelters |
Milbank:
- U5136-O-100S with K5415 stabilizer foot
|
100A meter pedestal for underground service. Ringless meter socket with horn bypasses.
|
MOST RECENT CHANGES
|
DATE |
USER |
EQUIPMENT |
STATUS |
REASON |
|
04/2003 |
Lamar Advertising |
Milbank 100A Meter Pedestal |
Added |
New Application |
|
NOTES: |
|
1. |
This table is a listing of specialized metering and service equipment used to serve other utilities and special municipal equipment. This table is not for general service use. |
|
2. |
The installation of all devices must conform to the lastest version of PPL's Rules For Electric Meter and Service Installations. |
|
3. |
Contact PPL for service requirements before installing equipment. |
|
4. |
Mounting height for pad mounted pedestals is a minimum 4 feet (centerline of meter to ground). Mounting height of wall or pole mounted device is 5 feet. |