Table 13
(print from .pdf)
Effective October 13, 2000
Updates All Previous Tables
TEMPORARY METER & SERVICE EQUIPMENT FOR CONSTRUCTION
SINGLE PHASE, SINGLE POSITION
OVERHEAD & UNDERGROUND SERVICE
120/240 Volt
100 Amp
4 Terminal
|
MFG. |
OVERHEAD SERVICE CATALOG # |
UNDERGROUND SERVICE CATALOG # |
|
MURRAY |
PM37RTS |
--- |
|
PM57RTS |
PM57RBS |
|
PM77RTS |
PM77RBS |
|
PM577RTS |
PM577RBS |
|
PM777RTS |
PM777RBS |
|
PM137RTS |
--- |
|
PM137RTSL |
--- |
|
|
|
SIEMENS |
P37RTS |
--- |
|
P57RTS |
P57RBS |
|
P77RTS |
P77RBS |
|
P577RTS |
P577RBS |
|
P777RTS |
P777RBS |
|
P137RTS |
--- |
|
P137RTSL |
--- |
|
MOST RECENT CHANGES |
|
DATE |
MFG. |
CATALOG # |
STATUS |
REASON |
|
|
|
|
|
|
|
NOTES: |
|
1. |
This table is a listing of meter socket/load center combinations approved for temporary use for construction sites only. This table is not for permanent or mobile home service use. |
|
2. |
The installation of all devices must conform to the latest version of PPL Electric Utilities' "Rules For Electric Meter and Service Installations". |
|
3. |
Contact PPL Electric Utilities for service requirements before installing equipment. |
|
4. |
The service equipment must have a minimum interrupting capacity of 10,000 amperes. |
|
5. |
All meter section covers must be ringless style. |
|
6. |
Meter bypasses are not required. |