Rule 1
10-21-2009 |

General
(a) PPL EU's Standard Service (b) Overhead System (c) Underground System (d) Meter Sequence (Hot/Cold) (e) Single Point of Service (f) PPL EU Specifies Service Characteristics, Method of Service/Supply and Point of Service (g) Notify PPL EU of Load Growth (h) Separate Point of Service (i) Alternate Service (j) PPL EU Makes All Connections (k) Alteration of Interference with PPL EU's Property (l) Placement of Swimming Pools, Fountains and Similar Installations (m) Hazardous Locations (n) Electrical Equipment Covers |
Rule 2
04-17-2009 |
Service Available At Secondary Voltage
(a) Standard Service Voltages (b) Residential Service (c) Combine Three Phase and Single Phase Loads (d) Customer Loads Under 10KW Diversified (e) Meter Base Not Used as Junction and/or Pull Box NOTES: 1. 2 Wire Service Limited 2. Residential Service at 120/208 Volts 3. Single Phase, 3 Wire Service 4. Three Phase, 4 Wire, 240 Volt, Delta Service 5. Three Phase, 3 Wire, 480 Volt, Delta Service 6. Three Phase, 4 Wire, 480Y/277 Volt Service |
Rule 3 dated 03-22-2006 |
Service Available At High Voltage
(a) Service at Line Voltage (b) Service at Other Than Line Voltage (c) Standard Service Voltages (d) Transformer Voltage and Tap Specifications (e) Single Phase High Voltage Service |
Rule 4 dated 08-10-2006 |
Secondary Service - Service Drop and Point of Attachment Information
(a) Method of Service (b) PPL EU Designates Point of Attachment (c) Point of Attachment (d) Maximum Length of Service Drop (e) Service Attachment (f) Attachment for Low Buildings (g) Attachment to Customer-Owned Service Pole |
Rule 4A dated 06-02-2006 |
Secondary Service - Clearance Information
(a) Clearances Over Areas and Buildings (b) Clearances Under Communication Company Lines (c) Clearances Between Gas Facilities and Electric Meters (d) Clearances Between Satellite Dish and PPL EU Facilities |
Rule 4B dated 06-02-2006 |
Secondary Service - Relocation and Temporary Service
(a) Relocating PPL EU's Facilities at Customers Request (b) Relocation of PPL EU's Facilities - Governmental Requirements (c) Temporary Service for Construction |
Rule 5 dated 05-03-2006 |
Secondary Service - Up To 600 Volts - Service Entrance Conductors
(a) Capacity-Residential Units (b) Capacity-Commercial and Industrial Installations (c) Common Connection for Multiple Conductors (d) Weather Head Installation (e) Service Entrance Conduit and Conductors (f) Bare Grounded Neutral (g) Conductor With Higher Voltage To Ground for 3 Phase, 4 Wire, 120/240 Volt Delta Service (h) Grounding Conductor for 3 Phase, 3 Wire, 480 Volt Delta Service |
Rule 6 dated 10-12-2006 |
Secondary Service - Underground Service From Overhead Distribution
(a) PPL EU Provides Lateral (b) Customers Service Pole for Alternative Method and General Specifications for Customers Installation |
Rule 7 04-17-2009 |
High Voltage Service - Exceeding 600 Volts Through 15kV - Overhead Service From Overhead Lines
(a) Method of Service/Supply (b) Location of Customer's Service Pole or Structure (c) Customers Service Pole or Structure (d) Customer's Disconnecting Means (e) PPL EU's Specifies Characteristics (f) PPL EU' Service Wires (g) Alternate Service |
Rule 8 dated 04-25-06 |
High Voltage Service - Exceeding 600 Volts Through 15kV - Underground Service From Overhead Lines
(a) PPL EU Supplies Lateral (b) Location of Customer Service Pole or Structure for Alternative Method and General Specification for Customer's Installation |
Rule 9 dated 08-04-2006 |
High Voltage Underground Primary From Overhead Secondary Voltage Service
(a) At Customer's Request (b) Type Equipment Used (c) Equipment Furnished by PPL EU (d) Facilities Furnished by Customer (e) Selecting Location for Transformers (Access) (f) Selecting Location for Three Phase Pad Mounted Transformers Foundation (g) Selecting Location for Overhead Transformers In Vault - NOT FOR NEW CONSTRUCTION (h) Customer Responsibility Regarding Location for Transformers (i) Lighting, Drains, Ventilation and Lock for Door Into Vaults - NOT FOR NEW CONSTRUCTION (j) Point of Service (k) Service Laterals (l) Location of Meters (m) Service Lateral Cables Terminating in Cubicles (n) Terminating Customer's Service Entrance Conductors In A Vault - NOT FOR NEW INSTALLATIONS |
Rule 10 dated 06-19-2006 |
Low Tension Network (LTN) - Service in Downtown Business Districts
(a) PPL EU Low Tension Network (LTN) Locations (b) PPL EU Establishes (c) Secondary Voltage and Load Criteria (d) Load Limitation for Existing Services (e) Point of Service (f) Location of Point of Service (g) Multiple Points of Service (h) High Voltage Service (i) Facilities Installed by PPLEU (j) Transformer Vault in Customer's Building |
Rule 11A dated 06-02-2006 |
Underground Distribution In Commercial Or Industrial Development Areas
(a) Development Defined (b) Underground System Defined (c) Agreement Conditions (d) PPL EU Installs Electrical System (e) Selecting Location for Vaults and Transformers (f) Service Laterals Installed After System is Completed |
Rule 11B dated 06-02-2006 |
Underground Electric Service In Residential Developments
(a) Residential Development Defined (b) Ownership (c) Point of Service (d) Street Lighting (e) Standard Installation (f) Applicants Responsibility (g) Additional Costs (h) Tariff Rule (i) Conduit Requirement |
Rule 12
04-17-2009 |
Meters - General
(a) Customer Provides Space (b) Capacity Determined by PPL EU (c) Customer Installs Meter Mounting (d) PPL EU Installs, Relocates or Removes All Meters (e) Metered and Unmetered Conductors Not In Same Raceway (f) Meter Base Not Used As Junction and/or Pull Box (g) Protective Barriers
|
Rule 13 dated 05-30-2007 |
Meters - Secondary Service - Under 600 Volts - Location
(a) Meter Location-Outdoor (b) Mounting Height of Meter (c) Meter Location-Indoor (d) Working Space (e) Attachment Permit for Meters on PPL EU Pole (f) Aesthetic Meter Locations |
Rule 14
06-10-2008 |
Meters - Secondary Service-Self Contained Installations
(a) Self-Contained Metering (b) Meter Bases (c) Location of Meter Base and Service Disconnect (d) By-Pass Facilities |
Rule 15
10-21-2009 |

Meters - Secondary Service Under 600 Volts - Instrument Transformer Installations
(a) Instrument Transformers (b) Outdoor and Indoor Installations (c) Service Conductor Connection in Instrument Transformer Cabinet (d) Location of Metering (e) Switchgear (f) Current Limiting Fuses (g) Current Transformer Polarity (h) Meter Panel and Conduit |
Rule 16
04-14-2009 |
Meters - Secondary Service-Multimeter Installations
(a) Grouping (b) Identify Meters and Service Entrance Equipment (c) Method of Installing Self Contained Meter Bases (d) Method of Installing Self Contained and Secondary Metering (e) Common Service Entrance Conductors - Up to Six Meters (f) Common Service Entrance Conductors - Exceeding Six Meters (g) Multi-Meter Arrangement for a Single Service Installation |
Rule 17 dated 06-02-2006 |
Meters - Secondary Service-Indoor Meter Base Mountings
(a) When Required (b) Construction Material |
Rule 18 dated 06-26-2006 |
Meters and Metering Equipment - High Voltage Service Exceeding 600 Volts Through 15kV
(a) PPL EU Specifies Equipment Location (b) Outdoor Pole Mounted Installation (c) Underground Service to Switchgear (d) Specifications for Switchgear (e) Specifications for Switchgear - Accessible Compartment for Current Transformers and Voltage Transformers (f) Meter Panel Mounting (g) Conduit for Metering Cable |
Rule 19 dated 11-10-2009 |

Customer's Equipment - Inspection
(a) Requirements (b) Inspection and Approval (c) PPL EU May Refuse to Connect to Customer's Facilities Which are Dangerous and Defective (d) PPL EU Is Not Responsible for Customer's Wiring or Equipment (e) Electrical Inspection Required After A Fire (f) Cut-In Card Documents |
Rule 20 dated 06-02-2006 |
Customer's Equipment - Grounding
(a) Grounding Neutral and Raceway (b) Grounding Meter Base (c) Grounding Metal Buildings and Vehicle Frames (d) Installation of Grounding Electrode Conductor (e) Communication Grounds |
Rule 21 dated 05-03-2006 |
Customer's Equipment - Service Disconnecting Equipment
(a) Requirements (b) Amperes Interrupting Capacity (AIC) Rating of Service Equipment (c) Secondary Lighting Arrestors (d) Current Limiting Fuses |
Rule 22 dated 05-03-2006 |
Customer's Equipment - Single Phase Motor Installations
(a) Voltage Drop and Flicker (b) Normal Limitation - 5 HP or Smaller (c) PPL EU Approval Above Normal Limitations - Above 5 HP (d) Recommended Voltage (e) Central Heating Systems |
Rule 23 dated 06-02-2006 |
Customer's Equipment - Polyphase Motor Installations
(a) Starting Current Limitations (b) Phase Reversal Protection (c) Three-Phase Motor Issues |
Rule 24 dated 06-02-2006 |
Customer's Equipment - Welders, Arc Furnaces, Induction Furnaces And Similar Equipment
(a) Installation Subject to PPL EU Approval |
Rule 25 dated 06/13/2006 |
Customer's Equipment - Power Factor Corrective Equipment
(a) Installation Subject to Company Recommendations (b) Methods of Switching Capacitors |
Rule 25A dated 05-03-2006 |
Customer's Equipment - Electric Demand Control And Data Collection Equipment
(a) Conditions for Providing Demand Pulses (b) Customer Owned Current Transformers Not Allowed |
Rule 26 dated 01-25-2007 |
Customer's Equipment - Standby Generating Equipment
(a) Standby Generators (b) Consult PPL EU Before Installation (c) Method of Installation (d) Emergency Lighting Systems |
Rule 27 dated 06-02-2006 |
Customer's Equipment - Mobile Homes
(a) Definition of Mobile Home (b) Mobile Home Service Equipment (c) Grounding |
Rule 28 dated 06-02-2006 |
Customer's Equipment - Customer Owned Generation Operated in Parallel With PPL EU's System
(a) Conditions for Interconnection - Permitted by PPL EU (b) Conditions for Interconnection - Customer Requirements (c) Detrimental Installation |
Rule 32 dated 06-02-2006 |
Customer's Equipment - Harmonic Distortion
(a) Customer Responsibility (b) PPL EU Specifies Harmonic Distortion Criteria (c) Customer is Responsible for Corrective Measures |
Rule 33 dated 12-19-2006 |
Customer's Equipment - Quality Of Power
(a) PPL EU Does Not Claim to Provide Disturbance Free Power (b) Customer Selects Power Conditioning Equipment (c) PPL EU Recommendations (d) Point of Use Tank Less Water Heaters |
Rule 34 dated 05-03-2006 |
Customer's Equipment - Fast Track Program
(a) Fast Track Program (b) Applicable Service Upgrades (c) Electrical Contractors Authorized by PPL EU (d) Approved Connectors |