Customer Reference Specifications

Rules for Electric Meter and Service Installations (REMSI)

"If you are having problems viewing pdfs in Internet Explorer, please use Google Chrome to view."

Specification Number

Description

6-09-192
Replaces
LA-17251
updated icon 1/16/2017

12kV 3-Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Underground)

6-09-194
Replaces
A-128453
updated icon 1/16/2017

12kV 3-Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Overhead)

6-09-195
Replaces
A-188075
updated icon 1/16/2017

7.2kV Single Phase Service Interrupter Switch on Customer-Owned Pole Overhead Supply to Overhead or Underground

6-09-196
Replaces
A-188076
updated icon 1/16/2017

12kV 3-Phase Service Metering on Customer-Owned Pole (Overhead Supply to Overhead)

6-09-197
Replaces
A-188077
updated icon 1/16/2017

12kV 3-Phase Service Metering on Customer-Owned Pole (Overhead Supply to Underground)

6-09-199
Replaces
LA-17936
updated icon 1/16/2017

3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments in Customer-Owned Switchgear, Underground Supply

 6-09-200
updated icon 1/16/2017
7.2kV Single Phase Service Metering on Customer-Owned Pole Overhead Supply to Overhead or Underground

6-10-165
Replaces
CRS-1001
A-190555 (6-01-141)
A-197765 (6-10-165)
updated icon 9/25/2017

Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE

6-14-121
Replaces
CRS-1003
updated icon 12/05/2016

Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Only Electric Lines (Non-Joint Trench)
Underground - General Specifications

6-14-122
Replaces
CRS-1013
updated icon 12/05/2016

Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Electric and/or Gas, Telecommunication Lines (Joint Trench)
Underground - General Specifications

6-14-125
Replaces
CRS-1010
updated icon 12/05/2016

Customer-Installed Screening of Pad-mounted Devices
Underground-General Specifications
Clearance Requirements for Placing Plants, Shrubbery or Structures around padmounted devices - Don't forget to "Call before you dig" dial 811, Know what's below!

6-15-160
Replaces
A-168712
updated icon 7/11/2016

Customer Installed Precast Manhole - Underground Structural

6-15-180
Replaces
6-15-181
updated icon 10/30/2015

Customer Installed Duct System - Underground Structural

6-17-122
Replaces
CRS-1002
updated icon  3/27/2017

Customer Installed Three-Phase Pad-Mounted Precast Transformer Foundation
Pad-Mounted and Submersible Transformers

6-17-163
Replaces
LA-17616
updated icon  1/30/2017

Customer Installed Transformer Vault; Vault Arrangement And Grounding Details 30 KVA to 2500 KVA Capacity
Pad-Mounted and Submersible Transformers

6-18-115
Replaces
CRS 402C-115
Replaces
CRS-1005
updated icon 4/27/2016

Installation Instructions for Customer Installed Conduit Systems on PPL Terminal Poles

6-19-100
Replaces
A-190556
updated icon 10/24/2016

Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances
Underground Secondaries and Services

6-19-133
Replaces
CRS-1014
updated icon  10/24/2016

Installation of 120/240 Volt Single-Phase Underground Lateral Sharing a Trench with Other Utilities (Joint Trench)
Underground Secondaries and Services 

6-19-134
Replaces
CRS-1009
updated icon 10/24/2016

Requirements for Trenching and Backfilling by Customer for 120/240 V Underground Service Laterals Installation in a Trench with only Electric Lines (Non-Joint Trench)
Underground Secondaries and Services 

6-22-187
Replaces
CRS-1006
406C-187
updated icon 3/27/2017

Installation Instructions for 3-Phase, 200 Amp Switchgear Foundation
Underground Sectionalizing

6-22-197 
Replaces
CRS-1007
406C-197
updated icon 3/272017

Installation Instructions for 3-Phase, 600 Amp Switchgear Foundation
Underground Sectionalizing

6-22-198
Replaces
CRS-406C-198
updated icon  3/27/2017

Installation Instructions for Precast Concrete Foundation for Three-Phase Pad-Mounted Manual or Automatic Source Transfer Switch
Underground Sectionalizing Ultra Service Park

 6-22-199
Replaces
CRS-1008
406C-199
updated: 11-21-2008

PPL EU Ultra Service Park

Typical Utility Plan

See Vegetation Management
updated icon 6/15/2016

Right-of-Way Clearing of Customer Service Extensions