Distributed Energy Resources (DER) Sketch Table (Updated 12/02/2022)

Master Sketch Table

DERs not using a utility-owned meter collar as a point of interconnection require an AC isolation device. This device must be lockable and have a visible air-break for isolation of the system from the utility grid. Please visit our REMSI Rule 28 page for more information on installation requirements. (Updated 11/04/2022)

Customer shall contact PPL EU prior to any new installations depicted in these sketches.

Metering Type

Voltage

Meter Base Size with Optional Collar

DER Max Current

 Phase 

Load Center Bus Bar Rating

Sketch #

Self-Contained ≤ 240V ≤ 200 Amps < 64.4 Amps N/A Sketch 56
Self-Contained ≤ 240V ≤ 200 Amps N/A 1 OR 3 ≤ 20% Sketch 56a
Self-Contained ≤ 240V ≤ 200 Amps N/A 1 OR 3 N/A Sketch 56b
480V Self-Contained 480V N/A N/A 1 OR 3 ≤ 20% Sketch 57
480V Self-Contained  480V  N/A N/A 1 OR 3 N/A Sketch 57a
CT/Secondary ≤ 480 N/A
N/A 1 OR 3 ≤ 20% Sketch 58
 CT/Secondary ≤ 480 N/A N/A  1 OR 3  N/A  Sketch 58a
 12kV  12kV Pole Mount N/A N/A 1 OR 3  ≤ 20%  Sketch 59
Pole Mount N/A N/A 1 OR 3  N/A Sketch 59a
Switch Gear N/A N/A  1 OR 3  N/A  Sketch 59b