Skip to main content

Master Sketch Table

Single Phase Overhead

These sketches provide rules for single-phase underground service. Specifications for overhead service are at the bottom of the page.

SKETCH # DESCRIPTION
Sketch 1 Triplex service drop attachment on building
Sketch 1A Pages 1 & 2 - Secondary service drop attachments
Sketch 3 Secondary service drop attachment to a mast attached to low building to provide required clearances

Sketch 4

Secondary service drop attachment on temporary structure for construction

Sketch 5

Overhead secondary service drop attachment to customer-owned service and meter pole for overhead distribution.

Sketch 6

Overhead secondary service drop attachment to customer-owned service and meter pole for underground distribution. 600A max.

Sketch 14a

Typical arrangement of instrument transformers and mounting for installation in instrument transformer cabinet.

Single-phase 120/240 volt or 240/208 volt, Network - 800 to 1200 ampere, single-phase 240/480 volt 600 to 800 ampere

Sketch 25

Secondary service meter base connections for self-contained meters overhead service. 100 and 200A.

Sketch 25B

Secondary service meter base connections for self-contained meters overhead or underground service. 400A

Sketch 26

Multi-meter installation using meter base with factory built-in bussing

Sketch 28

Secondary Service Multi-Meter Installation for Common Service with Instrument Transformer Cabinets and/or Meter Bases

Sketch 42

Multi-meter installation for overhead service drop attachment for mobile home court

Sketch 44

Service drop attachment to customer-owned service and meter pole for a mobile home

Sketch 47

Customer wood pole

Sketch 49

Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors

Sketch 49A

Connector to be supplied by the customer for providing a single point of connection. Multiple overhead service entrance conductors.

Sketch 55

Clearances between gas facilities and electric meters

Sketch 55A

Clearances between objects and electric meters

Specs

SPEC # DESCRIPTION

6-10-165

"Requirements for Service to Customer-Owned Street Lighting Systems. SE rate."

 

 

Single Phase Underground

These sketches provide rules for single-phase underground service. Specifications for underground service are at the bottom of this section.

SKETCH # DESCRIPTION
Sketch 4A Underground secondary service to underground attachment on temporary structure for construction

Sketch 7

Typical Arrangement of Meter on Building

Sketch 7A

Slip riser for installation on single phase underground services

Sketch 14A

Arrangement of instrument transformers and mounting for installation in instrument transformer cabinet

Sketch 17

Arrangement of outdoor meter panel on building for CT metering. Services over 600A

Sketch 18

Arrangement of Indoor Metering Equipment to Accommodate either Self-Contained or Secondary Instrument Transformer Metering

Sketch 20

Barriers for equipment installed in location with vehicular traffic

Sketch 25A

Secondary service meter base connections for self-contained meters underground service 200A.

Sketch 25B

Secondary service meter base connections for self-contained meters overhead or underground service. 400A

Sketch 26

Multi-meter installation using meter base with factory built-in bussing

Sketch 27

Metered traffic signal and unmetered streetlight

Sketch 28

Secondary Service multi-meter installation for common service with instrument transformer cabinets and/or meter bases

Sketch 43

Multi-meter installation for underground service lateral attachment for mobile home court

Sketch 45

Outdoor mobile home pedestal. Underground service lateral

Sketch 47

Customer wood pole

Sketch 49

Typical Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors

Sketch 53 Typical arrangement of wood post pedestal.  Underground service lateral from OH or UG distribution. Single phase, 3 wire, 120/208 or 120/240 volts 

Sketch 54A

Termination cabinet for 1 set of cable

Sketch 55

Clearances between gas facilities and electric meters

Sketch 55A

Clearances between objects and electric meters

Specs

SPEC # DESCRIPTION

6-10-165

"Requirements for Service to Customer-Owned Street Lighting Systems. SE rate."

6-14-121

Primary and Secondary trench. Electric only. (non-joint trench)

6-14-122

Primary and Secondary trench (joint trench)

6-14-125

Placing Plants, Shrubbery or Structures around pad-mounted devices

6-18-115

Installation Instructions for Customer Installed Conduit Systems on PPL Terminal Poles

6-19-133

Service Trench. Electric only. (joint trench)

6-19-134

Service Trench. Electric only. (non-joint trench)

 

 

Three Phase - Overhead 208V–240V

 

SKETCH # DESCRIPTION
Sketch 5

Overhead secondary service drop attachment to customer-owned service and meter pole for overhead distribution. 600A max.

Sketch 6

Overhead secondary service drop attachment to customer-owned service and meter pole for underground distribution. 600A max.

Sketch 8C

Meter panel installation for use in conjunction with instrument transformer metering

Sketch 8D

Meter panel mounting arrangement for use with instrument transformer metering

Sketch 14C

Typical arrangement of instrument transformers and mounting for installation in instrument transformer cabinet. 1200A max.

Sketch 14D

Overhead instrument transformers and mounting for installation in instrument transformer cabinet. 2000A max

Sketch 25

Secondary service meter base connections for self-contained meters overhead service. 100 and 200A.

Sketch 25B

Secondary service meter base connections for self-contained meters overhead or underground service. 400A

Sketch 28

Secondary Service Multi-Meter Installation for Common Service with Instrument Transformer Cabinets and/or Meter Bases

Sketch 46

Wiring diagram equipment used to provide demand pulses for customer use

Sketch 47

Customer wood pole

Sketch 49

Typical Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors

Sketch 49A

Typical connector to be supplied by the customer for providing a single point of connection. Multiple overhead service entrance conductors.

Sketch 55

Clearances between gas facilities and electric meters

Sketch 55A

Clearances between objects and electric meters

 

 

Three Phase - Underground 208V-240V

These sketches provide rules for three-phase underground (208V-240V) service. Specifications for underground service are at the bottom of this section.

SKETCH # DESCRIPTION

Sketch 7B

Typical Arrangement of Meter on Building

Sketch 8C

Meter panel installation for use in conjunction with instrument transformer metering

Sketch 8D

Meter panel mounting arrangement for use with instrument transformer metering

Sketch 14

Instrument transformers and mounting for installation in instrument transformer cabinet. 1200A max.

Sketch 14B

Instrument transformers and mounting for installation in instrument transformer cabinet. 2000A max.

Sketch 16

Pad mounted metering and service termination cabinet up to eight 750 KCMIL conductors per phase. 208V, 2000A max.

Sketch 16A

Pad mounted metering and service termination cabinet up to twelve 750 KCMIL conductors per phase. 208V, 3200A max.

Sketch 18

Indoor Metering Equipment to Accommodate either Self-Contained or Secondary Instrument Transformer Metering

Sketch 20

Barriers for equipment installed in location with vehicular traffic

Sketch 21

Typical arrangement of instrument transformers in switchgear cubicle

Sketch 25A

Secondary service meter base connections for self-contained meters underground service. 200A

Sketch 25B

Secondary service meter base connections for self-contained meters overhead or underground service 400A.

Sketch 28

Secondary service multi-meter installation for common service with instrument transformer cabinets and/or meter bases.

Sketch 40

Structural facilities installed by customer to accommodate underground service from a 3 phase pad-mounted transformer

Sketch 46

Wiring diagram equipment used to provide demand pulses for customer use

Sketch 47

Customer wood pole

Sketch 49

Typical Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors

Sketch 53

Typical arrangement of wood post pedestal. Underground service lateral from OH or UG distribution

Sketch 54

Termination cabinet for 2-6 sets of cable

Sketch 54A

Termination cabinet for 1 set of cable

Sketch 55

Clearances between gas facilities and electric meters

Sketch 55A

Clearances between objects and electric meters

Specs

SPEC # DESCRIPTION

6-14-125

Placing Plants, Shrubbery or Structures around pad-mounted devices

6-15-160

Customer Installed Precast Manhole

6-15-180

Customer Installed Duct System

6-17-122

Customer Installed Three-Phase Pad-Mounted Precast Transformer Foundation. 75KVA to 2500KVA Capacity

6-17-163

Customer Installed Transformer Vault. 30KVA to 2500KVA Capacity

6-18-115

Installation Instructions for Customer Installed Conduit Systems on PPL Terminal Poles

6-19-100

Customer Low-Voltage Switchboards. Service Cable Terminal Compartment.

6-22-187

Installation Instructions for 3-Phase, 200 Amp Switchgear Foundation

6-22-197

Installation Instructions for 3-Phase, 600 Amp Switchgear Foundation

6-22-198

Three-Phase Pad-Mounted Manual or Automatic Source Transfer Switch

6-22-199

PPL EU Ultra Service Park Typical Utility Plan

 

 

Three Phase - Overhead 480V

SKETCH # DESCRIPTION

Sketch 8C

Meter panel installation for use in conjunction with instrument transformer metering

Sketch 8D

Meter panel mounting arrangement for use with instrument transformer metering

Sketch 14C

Arrangement of instrument transformers and mounting for installation in instrument transformer cabinet. 1200A max.

Sketch 14D

Arrangement of overhead instrument transformers and mounting for installation in instrument transformer cabinet. 2000A max

Sketch 47

Customer wood pole

Sketch 49

Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors

Sketch 49A

Connector to be supplied by the customer for providing a single point of connection. Multiple overhead service entrance conductors.

Sketch 55

Clearances between gas facilities and electric meters

Sketch 55A

Clearances between objects and electric meters

Three Phase - Underground 480V

These sketches provide rules for three-phase underground (480V) service. Specifications for underground service are at the bottom of this section.

SKETCH # DESCRIPTION

Sketch 8C

Meter panel installation for use in conjunction with instrument transformer metering

Sketch 8D

Meter panel mounting arrangement for use with instrument transformer metering

Sketch 15

Instrument transformer and mounting for installation in instrument transformer cabinet underground. 3 wire, 1200A max

Sketch 15A

Instrument transformers and mounting for installation in instrument transformer cabinet underground service. 800A max

Sketch 16

Pad mounted metering and service termination cabinet up to eight 750 KCMIL conductors per phase. 2000A max.

Sketch 16A

Pad mounted metering and service termination cabinet up to twelve 750 KCMIL conductors per phase. 3200A max.

Sketch 20

Barriers for equipment installed in location with vehicular traffic

Sketch 23

Typical arrangement of instrument transformers in switchgear cubicle

Sketch 40

Typical arrangement of structural facilities installed by customer to accommodate underground service from a 3 phase pad-mounted transformer

Sketch 47

Customer wood pole

Sketch 49

Typical Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors

Sketch 50

Termination compartment service entrance arrangements

Sketch 54A

Termination cabinet for 1 set of cable

Sketch 55

Clearances between gas facilities and electric meters

Sketch 55A

Clearances between objects and electric meters

Specs

SPEC # DESCRIPTION

6-14-125

Placing Plants, Shrubbery or Structures around pad-mounted devices

6-15-160

Customer Installed Precast Manhole

6-15-180

Customer Installed Duct System

6-17-122

Customer Installed Three-Phase Pad-Mounted Precast Transformer Foundation. 75KVA to 2500KVA Capacity

6-17-163

Customer Installed Transformer Vault. 30KVA to 2500KVA Capacity

6-18-115

Installation Instructions for Customer Installed Conduit Systems on PPL Terminal Poles

6-19-100

Customer Low-Voltage Switchboards. Service Cable Terminal Compartment.

6-22-187

Installation Instructions for 3-Phase, 200 Amp Switchgear Foundation

6-22-197

Installation Instructions for 3-Phase, 600 Amp Switchgear Foundation

6-22-198

Three-Phase Pad-Mounted Manual or Automatic Source Transfer Switch

6-22-199

PPL EU Ultra Service Park Typical Utility Plan

 

 

Primary - Overhead 12kV

These sketches provide rules for primary overhead 12kV service. Specifications for overhead service are at the bottom of this section.

Specs

SPEC # DESCRIPTION

6-09-100

12 kV 3-Phase Service - Electronic Controlled Recloser - On Customer Owned Pole. Overhead supply to overhead.

6-09-192

12 kV 3 Phase Service Fused Interrupter Switch on Customer-Owned Pole. Overhead Supply to Underground.

6-09-194

12 kV 3 Phase Service Fused Interrupter Switch on Customer-Owned Pole. Overhead supply to overhead.

6-09-195

7.2 kV Single Phase Service Fused Interrupter Switch and Metering on Customer-Owned Pole. OH supply to OH or UG

6-09-196

12 kV 3 Phase Service Metering on Customer-Owned Pole. Overhead supply to overhead.

6-09-197

12 kV 3 Phase Service Metering on Customer-Owned Pole. Overhead supply to underground

6-09-200  7.2kV Single Phase Service Metering on Customer-Owned Pole Overhead Supply to Overhead or Underground

 

 

Primary - Underground 12kV

 

Specs

SPEC # DESCRIPTION

6-09-199

7,200/12,470V Service Termination and Metering Compartments in Customer-Owned Switchgear

6-15-160

Customer Installed Precast Manhole

6-15-180

Customer Installed Duct System

6-18-115

Installation Instructions for Customer Installed Conduit Systems on PPL Terminal Poles